A Westinghouse turbine with an electrical rating of 44.5MW was upgraded at a coal power utility in Panama. The mechanical governing system upgrade was considered due to the following reasons: poor control response, hard to adjust and it was very expensive to service and maintain. The customer wanted automation of the turbine governor to improve system performance and maximize unit availability and efficiency.

 

Woodward Steam Turbine Project

Reference Nr.: 7354

Components:

  • Woodward 505 Speed Control
  • Woodward Atlas-SC
  • Programmable Control Sequencing,
    Turbine Protection Logic
  • Woodward ProTech 203 TMR
    Overspeed Protection System
  • Woodward SPC Actuation
  • Hydraulic Power Cylinder
  • HPU, Hydraulic Power Unit

Modes:

  • Cold And Hot Ramp Rates
  • Two critical speed avoidance bands
  • Inlet Pressure Limiting
  • kW Load Limiting
  • Parallel Operation with utility
  • Island Mode Operation
  • Alarm Detection
  • Turbine Protection+ Shutdown Logic
  • Auxiliary Control
  • First Out Alarm Indication
  • Auxiliary Control
  • First Out Alarm Indication

 